Strike plate
The Guild of Architectural Ironmongers publication Glossary of architectural hardware terms defines a strike plate as a 'flat metal plate fixed to the door frame into which the bolt or bolts shoot. There is a shaped or bevelled lip on one side to guide the latchbolt. A strike plate is always provided with a mortice lock or latch, and with rim locks on an outward opening door.' It defines a keep as an 'alternative word for a staple or strike plate i.e. the part of the lock which receives the bolt and secures the door.'
[edit] Related articles on Designing Buildings
- Access control.
- Active door leaf.
- Digital door lock market.
- Doors.
- Emergency Exit Device.
- Entry control.
- External doors..
- Fire Door Inspection Scheme.
- Fire door.
- Fire Doors (DG 524).
- Fire.
- Grenfell tower.
- Hinge.
- Home security solutions market.
- How door locks work.
- Installing fire doors and doorsets (GG 86).
- Intumescent strip.
- Mortice lock.
- Mortise vs mortice.
- Noise - doors and windows.
- Outbuildings security.
- Perimeter security.
- Protected door.
- Self-closing device.
- Security and the built environment.
- Security glazing.
- Slave door leaf..
- Smoke control door.
- Sneck.
- Types of alarm.
- Types of door
- Types of lock.
- Width of doors stairs and escape routes.
Featured articles and news
Core construction skills explained
Preparing for a career in construction.
Retrofitting for resilience with the Leicester Resilience Hub
Community-serving facilities, enhanced as support and essential services for climate-related disruptions.
Some of the articles relating to water, here to browse. Any missing?
Recognisable Gothic characters, designed to dramatically spout water away from buildings.
A case study and a warning to would-be developers
Creating four dwellings... after half a century of doing this job, why, oh why, is it so difficult?
Reform of the fire engineering profession
Fire Engineers Advisory Panel: Authoritative Statement, reactions and next steps.
Restoration and renewal of the Palace of Westminster
A complex project of cultural significance from full decant to EMI, opportunities and a potential a way forward.
Apprenticeships and the responsibility we share
Perspectives from the CIOB President as National Apprentice Week comes to a close.
The first line of defence against rain, wind and snow.
Building Safety recap January, 2026
What we missed at the end of last year, and at the start of this...
National Apprenticeship Week 2026, 9-15 Feb
Shining a light on the positive impacts for businesses, their apprentices and the wider economy alike.
Applications and benefits of acoustic flooring
From commercial to retail.
From solid to sprung and ribbed to raised.
Strengthening industry collaboration in Hong Kong
Hong Kong Institute of Construction and The Chartered Institute of Building sign Memorandum of Understanding.
A detailed description from the experts at Cornish Lime.
IHBC planning for growth with corporate plan development
Grow with the Institute by volunteering and CP25 consultation.
Connecting ambition and action for designers and specifiers.
Electrical skills gap deepens as apprenticeship starts fall despite surging demand says ECA.
Built environment bodies deepen joint action on EDI
B.E.Inclusive initiative agree next phase of joint equity, diversity and inclusion (EDI) action plan.
Recognising culture as key to sustainable economic growth
Creative UK Provocation paper: Culture as Growth Infrastructure.

























